Indonesia gradually improves the electricity system's reliability and reaches the areas which contain frontier, outermost and underdeveloped areas by utilizing local energy potential. It can be done independently and in groups to meet the need for electrical energy in remote villages. Electrical power is obtained from generators and solar modules installed in each resident's house, where the capacity and quality are minimal. The initial study was completed in 2019 and took place in Central Kalimantan province, divided into three districts consisting of ten villages. Access to the village is a challenge in satisfying electrical energy needs, so alternatives are needed to meet the demands of electrical energy for areas that are difficult to reach by the electricity network. The solar power plant is one alternative to using new and renewable energy. The State Electric Company is an Indonesian state-owned enterprise that generates, transmits, and distributes electric power which also responsible to provide the electricity network in Indonesia. This study's village information was obtained from the survey results, village energy needs, and costs incurred when the solar power system was installed.


Full Text:

PDF

References


Badan Pusat Statistik Propinsi Kalimantan Tengah. (2018, August 16).

Retrieved from https://kalteng.bps.go.id/

Statistik Ketenagalistrikan Tahun 2019

https://gatrik.esdm.go.id/assets/uploads/download_index/files/c4053-statistik-2019-highres.pdf

https://www.setda.lamandaukab.go.id/tiga-desa-di-kecamatan-belantikan-raya-terima-bantuan-plts/

Triwulan III 2021, Rasio Elektrifikasi Tunjukkan peningkatan. ESDM. (n.d.). Retrieved October 26, 2022, from https://www.esdm.go.id/id/berita-unit/direktorat-jenderal-ketenagalistrikan/triwulan-iii-2021-rasio-elektrifikasi-tunjukkan-peningkatan

Panduan pengoperasian dan pemeliharaan PLTS off-grid. (2018a).

Adhiem, M. A., Hariyadi, Permana, S. H., & Burhanudin Mukhamad Faturahman. (2021). Pembangkit Listrik Tenaga Surya Bagi Pembangunan Berkelanjutan. Publica Indonesia Utama.

Sukandarrumidi, Kotta, H. Z., & Wintolo, D. (2018). Energi terbarukan: Konsep Dasar menuju Kemandirian Energi. UGM PRESS.

Boxwell, M. (2010). Solar electricity handbook: A simple, practical guide to solar energy - Designing and installing photovoltaic solar electric systems. Greenstream Publishing.

Wibawa, U. (2017). Pendekatan praktis pembangkit energi baru & Terbarukan. Universitas Brawijaya Press.

Publishing, T. (2020). Listrik : Pembangkit listrik tanaga surya (PLTS) Dan Kemajuan pembangunannya. Tempo Publishing.

Nugroho, H. (2022). Pembangunan Energi dan Pertambangan Indonesia: Kebijakan dan Tantangannya. PT Penerbit IPB Press.

Afif, F., & Martin, A. (2022). Tinjauan Potensi dan Kebijakan Energi Surya di Indonesia. Jurnal Engine: Energi, Manufaktur, Dan Material, 6(1), 43. https://doi.org/10.30588/jeemm.v6i1.997

Nugroho, H. (2022). Pembangunan Energi dan Pertambangan Indonesia: Kebijakan dan Tantangannya. PT Penerbit IPB Press.

I., K. T. (Indonesia). D. P. R. Daerah. T. (1972). Laporan team I DPRD tk. I Kalimantan Tengah.

Pola pemukiman daerah pedesaan daerah Kalimantan Tengah. (1984).

Nugroho, H. (2022). Pembangunan Energi dan Pertambangan Indonesia: Kebijakan dan Tantangannya. PT Penerbit IPB Press.




DOI: https://doi.org/10.12962/jaree.v7i1.327

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.